top of page

JOURNEY TO THE PRESENT STATUS OF LIBRARY

EARLY ERA

During the initial time (2009-2011) our institute was running in a GTHS building (temporary location of our institute because present campus was under construction). This was an era when the institute was facing the extreme shortage of faculty members, non-teaching staff as well as other resources. A small dark room with heavy humidity was only available for placing the books of library. During this time several books were being affected by termite, but there was no effective solution due to unavailability of space. Being a teacher it was hearting us a lot.

SHIFTING OF LIBRARY

As the building of Mechanical branch got ready the first step was taken to shift the library books and other furniture. Most of the faculty members put their best efforts by helpin the shifting of library.

DURING 2014

Present library of our institute is the result of efforts made by several students as well as faculty members.

PRESENT STATUS

17 SEP 2018
bottom of page